AMERICAN FORK, UTAH | BATHROOM REMODEL

This owner wanted her bathroom updated and functional.

With no need for a separate tub and shower, the owner opted to remove the small existing shower for needed storage and change out the old tub to create a large walk-in shower. CK Builders updated plumbing to obtain a floor-mounted toilet and a walk-in shower. Updated the flooring, completed necessary drywall repairs, installed a vessel sink and vanity, added a new vanity light, and changed over ceiling lights to cans, installed a new toilet, added a new shower drain, valves, and trims. Removed wallpaper and painted to update this old bathroom to a new functional space.